• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer
  • HOME
  • DoPT
  • MACP
  • OROP
  • CSD
  • CG News Android App

CENTRAL GOVERNMENT EMPLOYEES NEWS

All about Central Government Employees News. Get the central govt employees latest news, DoPT Orders, 7th Pay Commission, DA Hike, latest notification for pensioners, MACP latest order, da for central government employees, and more.

  • 7th CPC
  • Railways
  • Pension
    • Retirement Age
  • Expected DA
    • Dearness Allowance
    • Dearness Relief
  • Defence
    • CGDA
  • EPFO
    • Employees News
      • KV School
      • Promotion
      • Maternity Leave
      • Reservation
      • LTC
    • ESIC
  • CGHS
  • MACP
  • Postal Dept
You are here: Home / General news / Mandatory installation of LED based lighting in all Government buildings
Latest List of KV Schools in India
Central Government Holiday Home List 2021
No DA/DR to Central Government employees till July 2021
Expected DA 2021
7th Pay Commission Latest News 2021
Latest DoPT Orders 2021
MACP for the Central Government Employees

Mandatory installation of LED based lighting in all Government buildings

August 12, 2017 by admin Leave a Comment

Mandatory installation of LED based lighting in all Government buildings

F.No.25(24)/E.Coord/2017
Ministry of Finance
Department of Expenditure
(E.Coord)

OFFICE MEMORANDUM

North Block, New Delhi
Dated: 4th August, 2017

Subject: Economy Measures – Mandatory installation of LED based lighting in all Government buildings – regarding

The Hon’ble Prime Minister on 5th January 2015 launched the National LED programme to facilitate rapid adoption of LED based home and street

lighting across the country. The programme components, Unnat Jyoti by
Affordable LEOs for All (UJALA) and Street Lighting National Programme (SNLP) are under implementation in 34 States and UTs. This programme along with Building Energy Efficiency Programme (BEEP) is being implemented by Energy Efficiency Services Limited (EESL), a joint venture company of four power sector Central PSUs. EESL works on Energy Services Company (ESCO) model wherein upfront investment is done by EESL and the investment is recouped on annuity basis with performance based guaranteed energy saving during the project period.

2. Pursuant to the above the Central Government has taken a decision for mandatory installation of LED based lighting and energy efficient equipments

(Fans & ACs) in all Government buildings.

3. Government buildings is a major source of energy consumption. Usage of LED based lightings and energy efficient equipments in Government buildings will lead to economy in expenditure and savings in the long run through reduction in energy consumed.

4. Keeping in view the economy in expenditure and savings that will entail, all Ministries/Departments are requested to convert the existing lightings/equipments into LED based lightings and energy efficient equipments on priority utilizing the services of CPWO/EESL.

5. The model Agreement/Contract to be entered in to between the Client Ministry/Department and EESL is enclosed for reference. The Client Ministry/Department and EESL on mutual agreement can modify/amend the provisions of the model Agreement/Contract to suit their specific requirements.

6. In respect of those Government buildings maintained by CPWD but where the electricity bill is borne/paid by the respective Ministries/Departments, CPWD (as third party) will countersign the agreement to provide comfort to the Ministry/Department as well as extending help for implementing the contract.

7. Action taken in this regard be reported to Ministry of Power and Department of Expenditure by 15.08.2017 for monitoring purposes.

(H. Atheli)
Director

To

All Secretaries of Ministries/Departments
Copy to
1. Cabinet Secretary, Government of India
2. Prime Ministers’ Office, South Block

Download PDF

Related to Your Search:

  • Mandatory installation of LED based lighting in all Government buildings
  • Mandatory installation of LED based lightings in Government Buildings – Economy Measures
  • Installation of LED based Lightings in Central Government Buildings – CPWD
  • UJALA – Unnat Jyoti By Affordable LEDs for All : FAQ
  • DoE: Switch over from Petrol and Diesel vehicles to Electric vehicles for hired vehicles in Secretariats/Attached offices of Ministries and Departments of Government of India located in Delhi
  • Process of installing Solar Photovoltaic Systems in Government Offices
  • DoE – Switch to electric cars for hired vehicles in Secretariats – Ministers – Government department of India located in Delhi
  • Healthcare, Education Facilities for NPPS Employees
  • Economy in Use of Paper in Government Offices

Filed Under: General news Tagged With: Central Government, Economy Measures, Government buildings, Government Office, LED, LED based lighting

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


HOLIDAY LIST 2021

Kerala Holidays 2021 | Post Office Holidays 2021 | Delhi Holidays 2021 | Mumbai Holidays 2021 | Telangana Holidays 2021 | Central Govt Office Holiday 2021 in Hyderabad | Chandigarh Holidays 2021 | Kolkata Holidays 2021 | Railway Holidays CG Office Holidays 2021 | TN Govt Holidays 2021 | TN Restricted Holidays 2021 | Bank holidays 2021 | TN Bank Holidays 2021 | BSNL Holidays 2021 | Chhattisgarh Holidays 2021 | Gujarat Holidays 2021 | Goa Holidays 2021| KVS Holiday Calendar 2021-2022 | List of CSD Holidays 2021

Primary Sidebar

Important Central Government Employees Orders

  • MACP Scheme for Original Order Dated May 2009
  • 7th Pay Commission Revised Pay Matrix Table for Central Government Employees – Pay Matrix Level 12
  • CSD Canteen Price List 2021
  • CSD Latest Price List of Samsung Electronics items
  • CSD Military Canteen Products List 2020
  • CSD - Eligibility to buy cars 2020
  • FAQ - Central Government Employees - CCS
  • FAQ - Indian Air Force Pensioners
  • FAQ - About NPS

Archives – CG News

Categories

  • 6CPC (163)
  • 7CPC (2,018)
  • 8th Pay Commission (4)
  • Additional DA (4)
  • AICPIN (142)
  • Allowance (349)
  • Bonus (197)
  • BSNL (84)
  • CCS (173)
  • Central Government Jobs (173)
  • Central Govt Holiday Homes (5)
  • CGDA (108)
  • CGHS (421)
  • CPSE (48)
  • CSD (70)
  • CSS (113)
  • DA Over 50% (124)
  • Dearness Allowance (618)
  • Dearness Relief (55)
  • Defence (548)
  • Directorate of Estates (57)
  • DOPT Orders (1,320)
  • Employees News (2,414)
  • EPFO (184)
  • ESIC (27)
  • Expected DA (399)
  • expected da january 2020 (9)
  • General news (1,970)
  • GST (48)
  • Holidays (163)
  • HRA (74)
  • Income Tax (220)
  • IT Exemption (89)
  • KV School (254)
  • Latest News (1,276)
  • LDC-UDC (72)
  • Leave Rules (16)
  • Loan (16)
  • Lok Sabha Elections 2019 (15)
  • LTC (203)
  • MACP (233)
  • Maternity Leave (8)
  • NPS (75)
  • OROP (158)
  • Pension (1,170)
  • Postal Department (398)
  • Promotion (203)
  • Railways (1,429)
  • Rank Pay (57)
  • Reservation (91)
  • Retirement Age (187)
  • Uncategorized (1)

Recent Comments

  • P C Mathaikutty on Freezing of Dearness Allowance to Central Government employees and Dearness Relief to Central Government pensioners at current rates till July 2021
  • Provat Kumar Pal on Request to the PM to release DA to the central government employees and DR to the pensioners
  • Sampat Rambhau Warbhuwan on Over payments made to DAD employees on account of wrong pay fixation granting the benefit of financial up gradation under ACP/MACP scheme
  • naresh on Classification of Cities for HRA as per 7th CPC – X Y Z Classification of Cities for HRA 2020
  • P.C.Mathaikutty on Union Budget 2021 – Senior Citizens above 75 years of Age, Having Pension & Interest Income exempted from Filing Tax Return

7th CPC DA Arrears Ready Reckoner Tables for all Level

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-1 (GP 1800)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-2 (GP 1900)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-3 (GP 2000)

  • 7th CPC DA DA Arrears Ready Reckoner Tables for Level-4 (GP 2400)

  • 7th CPC DA DA Arrears Ready Reckoner Tables for Level-5 (GP 2800)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-6 (GP 4200)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-7 (GP 4600)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-8 (GP 4800)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-9 (GP 5400)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-10 (GP 5400)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-11 (GP 6600)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-12 (GP 7600)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-13 (GP 8900)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-13A (GP 8900)

  • 7th CPC DA Arrears Ready Reckoner Tables for Level-14 (GP 10000)

Pay Matrix Table for Air Force PBORs

7th Pay Commission Option Form Ready Reckoner For All Grade pay

central government news
Follow us on : facebook-central-government-news twitter-central-government-news pinterest-central-government-news

Footer

Central Government Employees News | Central Government News | Central Govt Employees News | Central Government Jobs & Orders | Central Government Latest News | central government employees news latest update | expected pay central govt employees | latest news macp central govt employees | Central govt employees news 7th pay commission

central government employees news

Central Government News App for Android Users – Free!! Download Now

 

7th CPC | CGDA | CGHS | CPSE | CSD | CSS | Dearness Allowance | Dearness Relief | Defence | DOPT Orders |
EPFO | ESIC | Expected DA | GST | Holidays | HRA | Income Tax | KVS | Leave Rules | LTC | MACP |
Maternity Leave | NPS | OROP | Pension | Postal Department | Promotion | Railways | Rank Pay | Reservation | Retirement Age

Copyright © 2021 · Magazine Pro on Genesis Framework · WordPress · Log in